Projects

Lucky Cement

LocationNooriabad

Year2004-2006

Client

Sub Contract to Mehran Engineer

  • Fabrication and erection of Pre-heater
  • Installation of Stacker Re-claimer and Crusher
  • Fabrication of cyclones, ducts, silos, beams, H-Beams
  • Platforms
  • Belt Conveyors and Structure
  • Compressed Air Pipe line

KAMONKY ENERGY POWER PLANT

LocationKamonky

Year2010-2012

ClientTKL

  • Installation 80MW engines
  • Tanks manufacturing capacity 500 Cubic meter to 20 Cubic meter
  • Pipe lines for Cooling water, Compressed Air System
  • Pre Engineering Building
  • Auxiliary Equipment Installation.
  • Fire Fighting System.
  • Cable Tray

PAKITEX BOARD Pvt. Ltd.

LocationKarachi

Year2012-2013

Client

  • Steel Structure
  • Ducting, bag filter, cyclone, silos and bulk silos.
  • Thermo Oil Piping
  • Insulation cladding
  • Sand blasting Painting

GULF MINERALS FZE Pvt. Ltd.

LocationBaluchistan

Year2013-2014

ClientGMF

  • Steel Structure for Spiral
  • Spiral Installation
  • Magnet Roller Installation
  • Screening Hopper
  • Feeder Hopper
  • Belt Conveyer

Novatex Limited

LocationBaluchistan

Year2013-2014

ClientGMF

Sub Contractor to (AA)

  • Pipe Lines for Cooling water, Compressed Air System
  • Fire Fighting System
  • Cable Tray

SNPC 100MW

LocationSindh Nooriabad Power Company.

Year2015-2017

ClientTKL

  • All our complete mechanical Fabrication, Erection equipment installation, Sand blasting Painting, Insulation work